Aeon Battery Installation Manual V1.2 JAN 2020 | pg. 19
4
INSTALL
45
22.5
22.5
160+spacing (5mm recommended)
A48-40-01: 1526
A48-40-02: 1561
Required
Required
Required
Required
4.3
Mounting the Battery
The provided mounting brackets are the
recommended mounting method, to mount
the battery to a wall using the provided
mounting brackets, take the following steps.
1. When installing the battery on a wall,
ensure the wall is capable of holding
the total combined load weight of the
batteries to be installed, 40kg per battery.
2. Mark and Pre drill holes the wall for
fasteners. Dimensions are in the diagram
to the right.
•
The 4 outermost screw holes are
required; the middle 2 holes are
optional.
•
Be advised, when mounting
horizontally the battery will rest on
the mounting hooks with a 12mm
drop.
3. Screw through the holes in the Top
Mounting Bracket and the Bottom
mounting bracket into the holes.
•
A minimum of 4 fasteners must be
used in the required hole locations.
•
The fasteners must be capable of
a combined shear load strength
of greater than 400N (40kg) and a
combined pull out load of 1600N
(80kg).
•
Due to the large variance between
installations Zenaji does not provide
fasteners.
Содержание Aeon A48-40-01
Страница 1: ...Aeon Battery A48 40 01 A48 40 02 Installation Manual Pty Ltd...
Страница 2: ......
Страница 25: ...Aeon Battery Installation Manual V1 2 JAN 2020 pg 25 6 TROUBLE...
Страница 31: ......
Страница 32: ......