Aeon Battery Installation Manual V1.2 JAN 2020 | pg. 17
3
PRODUCT
3.4
Additional Devices and Accessories
3.4.1
Additional Devices
Distribution blocks, bus bars or terminal blocks (one per pole) must be used when connecting
more than one battery to power equipment. Zenaji recommends a 300A or higher rated
block be used to allow for flexibility of the installation.
3.4.2
Mounting Accessories
Included with each battery are brackets to allow mounting of the battery to a wall or other
structure.
2x Mounting Plates
4x M8 Countersunk Bolts
(for Mounting Plates)
Top Mounting Hook
Bottom Mounting Hook
Содержание Aeon A48-40-01
Страница 1: ...Aeon Battery A48 40 01 A48 40 02 Installation Manual Pty Ltd...
Страница 2: ......
Страница 25: ...Aeon Battery Installation Manual V1 2 JAN 2020 pg 25 6 TROUBLE...
Страница 31: ......
Страница 32: ......