
pg. 6 | Zenaji Australia Pty Ltd
1
INFO
1
Information about this document
1.1
Target group
This document is intended for qualified personnel and any action described in this document
must be carried out by qualified personnel.
1.2 Designation
This document designated for the following Zenaji Products.
A48-40-01
A48-40-02
1.3
Glossary of Terms
Read this summary of terms before reading the remainder of the manual.
Power Equipment:
This refers to an electronic device an Aeon battery can be connected to
that can charge and/or discharge the battery. Most commonly this will be a Battery Charger/
Inverter or Hybrid Solar Inverter used with a solar photovoltaic power system for a house.
Battery:
In this document refers to one 1.93kWh Aeon Battery.
Battery System:
A battery or group of batteries connected to a single piece of power
equipment or multiple power equipment that is connected together.
Installed Battery:
A battery that is part of a battery system, already installed, commissioned
and in use.
Additional Battery:
A battery that is to be added to a previously commissioned battery
System.
Commission:
To begin the use of a battery system, after installing the batteries and the
circuit breakers have been switched to ON.
Qualified Personnel:
Personnel who have completed the required training and are certified
to undertake electrical works in their state.
Load weight:
The total weight of a battery system on the supporting wall.
Self-managed battery:
A battery which contains its own cell balancing and protection
equipment.
LTO:
Lithium Titanate, the cell chemistry used in Zenaji Aeon Batteries
Содержание Aeon A48-40-01
Страница 1: ...Aeon Battery A48 40 01 A48 40 02 Installation Manual Pty Ltd...
Страница 2: ......
Страница 25: ...Aeon Battery Installation Manual V1 2 JAN 2020 pg 25 6 TROUBLE...
Страница 31: ......
Страница 32: ......