Commissioning Report
You are required to fill out a commissioning report when first installing a Zenaji battery.
If installing an additional battery to a previously commissioned battery system a new
commissioning report must be filled out for the additional battery.
Please go to
www.zenaji.com
on a computer or mobile and follow the links to fill out the
commissioning report.
Alternatively, fill out the form on the following pages, scan and email to