
16
10
F
G
Mount the Control Box underneath of
the desk, preferably in between the two
Crossbar Rails, allowing at least one of the
leg control cables to plug directly into it
without the Extension Cable.
QUICK TIP: If you’ve purchased the
cable management channel, slide the
Control Box into the larger side of
the cable management channel. This
saves you screwing it in and hides it
completely.
Attach the Hand Controller so the front of the Controller is flush with the front desktop
edge using the Timber Screws. We recommend mounting it to the side that’s less likely
to be interfered with to avoid accidentally hitting it.
ASSEMBLY
SETUP INSTRUCTIONS
PROFESSIONAL SERIES LIFTING SYSTEM
11
Connect the Cables, Controller Cable, and the Power Cord to the Control Box as shown
in the diagram above.
Run as many of the cables through the Cable Management Channel to avoid having to
pin them up later on.
G
F
I
I
H
A
A