SAFETY INFORMATION
ZEISS
User Interface - Mounting and Dismounting Components
Lattice Lightsheet 7
42
000000-2324-960
04/2021 V_01
Hydraulical connections
•
Tubing connecting Gas Mixer with Hydraulic Column: White marked end (Fig. 24/
8
) couples to white
marked Gas Mixer output 2 (Fig. 22/
8
); non-marked end (Fig. 24/
5
) couples to non-marked Humidifying
Tubing Connector (input) (Fig. 23/
2
)
•
Tubing connecting Gas Mixer with Heated Chamber: Yellow marked end (Fig. 24/
9
) couples to yellow
marked Gas Mixer output 2 (Fig. 22/
9
); non-marked end with white connector (Fig. 24/
2
) couples to
connector of Heated Chamber.
•
Tubing connecting Gas mixer with Heated Chamber: Red marked end (Fig. 24/
4
) couples to red marked
Humidifying Tubing Connector (output) (Fig. 23/
1
); non-marked end with white connector (Fig. 24/
2
)
couples to connector of Heated Chamber.
Do not bend or cut the Heated Tubing. The heating wire inside the tubing may be damaged and
become non-functional.
Note that the tubing from the Gas Mixer (yellow marked output 2) combines with the tubing from the
Humidifying Column (red marked output) to the tubing connecting to the Heated Chamber.
1.13.6.3
Operation
The Gas Incubation System is combined with the Heating System, providing a fully controlled stage top
chamber.
Operation of the Heating System
1.
Connect the power socket (Fig. 22/
15
) via the power cable with its country-specific plug to the 3-point
connector.
2.
Connect the Can Bus 2 plug of the Gas Mixer (Fig. 22/
6
) via the CAN cable to the CAN connector GAS
socket of the Lattice Lightsheet 7 system (Fig. 2/
11
). The CAN connector TEMP socket of the Lattice
Lightsheet 7 (Fig. 2/
14
) remains free.
3.
Plug the electric cable from the Lattice Lightsheet 7 system (Fig. 21/
8
) to electric socket of the chamber
frame docking block (Fig. 21/
2
).
4.
Insert appropriate frame and close chamber by lid.
5.
Set the temperature via the Incubation tab in the ZEN Software.