
Y Z S y s t e m s • 8 8 2 5 N . S a m H o u s t o n P k w y We s t • H o u s t o n , Te x a s • U S A • 7 7 0 6 4 • P : 2 8 1 . 3 6 2 . 6 5 0 0 • F : 2 8 1 . 3 6 2 . 6 5 1 3
Page 19
DX-1000G/L ver.05132020
Section 5: Programming for Odor Concentra
tion Operation
Conducting An Odor
Concentration Test:
(cont.)
Step 9:
Set the altitude using the
arrow keys
and
press
Enter
. (Set to nearest 500 feet.)
Step 10:
Verify Data: verify that all data entered for
test location is correct by using arrow keys to scroll
through data. Press
Enter
to continue.
Step 11:
Is Data Correct? If correct, select
Yes
and press
Enter
and proceed to Step 12. If data
is incorrect select
No
and press
Enter
. Re-enter
information as required.
The configuring hardware display will be present
and the unit will begin to run to configure hardware
for a test.
Содержание DTEX DX1000G/L
Страница 1: ......
Страница 2: ......
Страница 3: ...Dual Process DTEX Instruction Operating Manual Version 05132020...
Страница 4: ......
Страница 39: ......