Install-Xander_Insert_BUILT-IN_ZC - 2021-11-25.docx www.yunca.co.nz
Page 5 of 18
I3.
WARNINGS:
A minimum of 450mm x 450mm space around the flue, in the enclosure ceiling,
through which the flue system passes, should be maintained to provide sufficient
ventilation in order to prevent heat build-up within the enclosure.
The constructed enclosure should
not
be capped off at ceiling level, as there
would be a considerable risk of fire from the build-up of heat. Such an installation
should be properly vented into the ceiling cavity with sufficient clearances to
comply with relevant building codes and practices.
For standard flue installations
(Fig. 3)
; if any support is required under the chimney
cap, it should be constructed of non-combustible materials only.
J.
YUNCA Insert Flue Kit
– Zero Clearance
(Complies with AS/NZS 2918:2001):
J1.
Zero Clearance (Built-in) Flue Kit consists of the following:
4.8m x 150mm stainless steel flue.
4.8m x 200mm galvanised liner.
4.8m x 250mm galvanised liner.
1 x top cap & cowl (cone).
Please Note:
All flue joints must be sealed with flue sealing compound. Use stainless steel
screws or rivets to join the flue pipe (three equally spaced places at each joint). The first length
of flue must be fixed to the flue spigot with at least one stainless steel screw or rivet. The
required minimum flue termination height is 4.6 metres above the floor protector.