Install-Xander_Insert_BUILT-IN_ZC - 2021-11-25.docx www.yunca.co.nz
Page 16 of 18
R15.
Reinstall the 4 screws, leveling the front fascia to align with the firebox (which you
have previously leveled) and centralising it about the firebox, so there is an equal
gap at the sides for the door to fit neatly into. Tighten the screws when you have
everything aligned correctly.