Install-Xander_Insert_BUILT-IN_ZC - 2021-11-25.docx www.yunca.co.nz
Page 14 of 18
R5.
Remove the two self tapping screws at the top outer corners of the firebox cowl and
remove the Primary Outer Casing Top Panel and set it aside. (The panel is a slip fit
under the panel at the rear of the flue spigot.)
R6.
Manoeuvre the firebox carefully into the previously prepar
ed “zero clearance” box
and use the M6 seismic retaining bolts (2 pos’ns) to attach firebox to the box at the
bottom front, at each side.
R7.
Reinstall fan unit on its mounting plate, back under the firebox. The two padded tabs
on the mounting plate insert into brackets and the plate is retained by the two M8
button head socket screws you removed earlier. Reinstall the screws complete with
split washers and tighten securely but do not over tighten.
R8.
Insert the fan power cable grommet into the notch in the side cowl of the firebox and
hang the cable outside the firebox ready to plug into the circuit box on the rear of the
fascia.
R9.
Apply fire cement sealant as required to the flue spigot and lower the Flue into the
spigot on top of the firebox and ensure it is fully seated.