![York YHAU-CL Series Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/york/yhau-cl-series/yhau-cl-series_installation-operation-and-maintenance_4218752098.webp)
JOHNSON CONTROLS
98
FORM 155.30-ICOM2.EN.UL
ISSUE DATE: 12/21/2018
SECTION 5 - COMMISSIONING
JOHNSON CONTROLS
5
FORM 155.30-CL1.EN.UL
ISSUE DATE: 12/11/2018
D. Remote Operation Check
1. Check that the chiller starts and stops using a remote
signal. .......................................................................
E. Operation Instruction
Review the operation and maintenance instructions in
the manual with the customer. ......................................
a. Customer Names:
1.
2.
3.
NOTES:
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
Customer Signature: _______________________________________
Form Completed by: _______________________________________
_______________________________________
Title:
: _____________ / ____________ /
___________
Month
Day
Year
Содержание YHAU-CL Series
Страница 14: ...JOHNSON CONTROLS 14 FORM 155 30 ICOM2 EN UL ISSUE DATE 12 21 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 20: ...JOHNSON CONTROLS 20 FORM 155 30 ICOM2 EN UL ISSUE DATE 12 21 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...JOHNSON CONTROLS 47 SECTION 4 TECHNICAL DATA 4 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 102: ...JOHNSON CONTROLS 102 FORM 155 30 ICOM2 EN UL ISSUE DATE 12 21 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 128: ...JOHNSON CONTROLS 128 FORM 155 30 ICOM2 EN UL ISSUE DATE 12 21 2018 THIS PAGE INTENTIONALLY LEFT BLANK...