Assembly
39
GLOBAL
INDUSTRIES, INC.
Drag Conveyors
10230011
2016-06-14
Covers
N
put the covers on
Conveyor covers are hemmed at the ends for
easy installation. After the chain is properly
installed, bolt on the covers (examples c and d).
Use 3/8” x 1” bolts with seal washers and
3/8” fl ange nuts. Covers do not require caulking.
First start installing covers at the conveyor tail.
Set the folded seams down on top over standing
seams. Continue working forwards until the
last cover is installed on the conveyor head.
(Conveyor chain is already fully installed but is
not shown in these examples.)
NOTE: Conveyors shown in this manual may look
different than your conveyor.
d) Bolt Covers on Correctly
COVER
3/8”
FLANGE
NUT
INTERMEDIATE
SECTION
3/8” x 1” BIN BOLT
WITH SEAL WASHER
towards
head
section
COVER
INTERMEDIATE
SECTION
FOLDED
SEAM
STANDING
SEAM
c) Install the Head Cover
3/8” x 1” BIN BOLT
WITH SEAL WASHER
INTERMEDIATE
COVER
HEAD
COVER
INTERMEDIATE
SECTION
HEAD
SECTION
3/8”
FLANGE
NUT
13