Drag Conveyors
10230011
2016-06-14
Intermediate In-Line Rack and Pinion Gate Assembly
Assembly
25
Optional
Field cut and remove a 35 1/2” [901 mm]
length segment from the intermediate bottom
(example below)
. Center the cut between
the 36” [914 mm] bolt centers. Position and
install the gate to the conveyor along with the
intermediate discharge hopper. Use shims
as shown
. Electric rack and pinion gates are
installed the same way.
towards
head
section
towards
tail
section
Caulk as needed.
Use 3/8” bolts
and flange nuts.
INTERMEDIATE SECTION
PARALLEL GATE SHIM
IN-LINE
RACK AND PINION
GATE
DISCHARGE HOPPER
ROPE
WHEEL
35 1/2” (+1/16” - 0)
[902 mm]
Gate slide
should open
towards the tail.
GRAIN FLOW
DIRECTION