
<4. Piping>
4-5
IM 11M13A01-04E
3rd Edition : Dec.15,2014-00
• Installation of Automatic Calibration Unit
Vertical mounting on the ZR202S (-B)
F4-4E.ai
Unit: mm
Horizontal mounting on the ZR202S (-A)
MAX
44
214
40
244
66.5
40
Span gas inlet
Rc1/4 or 1/4NPT(Female)
Rc1/4 or 1/4NPT(Female)
Reference gas inlet
Rc1/4 or 1/4NPT(Female)
Zero gas inlet
AUTOMATIC CALIBRATION UNIT
HORIZONTAL INSTALL
Terminal box
258
166.5
Display
● ●
180
MAX
44
40
60
66.5
40
166.5
45
160
AUTOMATIC CALIBRATION UNIT
Rc1/4 or 1/4NPT(Female)
Span gas inlet
Rc1/4 or 1/4NPT(Female)
Reference gas inlet
Rc1/4 or 1/4NPT(Female)
Zero gas inlet
●
●
Piping Diagram
SPAN IN
REF. IN
ZERO IN
F4-5E.ai
Calibration gas
Reference gas
ZR202S body
Span gas
solenoid valve
Span gas flowmeter
Reference gas flowmeter
To Air set
To Zero gas cylinder
Needle valve
Automatic Calibration Unit
Zero gas flowmeter
Zero gas solenoid valve
Check
valve
Содержание ZR202S
Страница 12: ...xi IM 11M13A01 04E Introduction ...
Страница 18: ...Blank Page ...
Страница 61: ...Blank Page ...
Страница 129: ...Blank Page ...
Страница 141: ...Blank Page ...
Страница 153: ......
Страница 155: ......
Страница 157: ......
Страница 159: ...Blank Page ...
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......