<3. OPERATION>
3-1
IM 12E01A06-02E
3. OPERATION
3.1 Preparation
3.1.1 Outline
F3-1E.ai
1. Installation Check
2. Piping Check
3. Wiring Check
4. Supplying Power
5. Warm-up
6. Setting and Checking Parameters
7. Calibration
• Make sure that TB750G converter and detector
are fixed fimly.
• Unused cable inlets should be plugged to
prevent moisture from entering.
• Note that the TB750G does not have an internal
power switch.
• Upon power up, allow the meter to warm up for
at least one hour.
• When using zero turbidity filter, allow water to
run through it for at least one hour.
• For details of calibrations, refer to the following
pages.
8. Supplying a Water Sample and
adjusting the flow rate
• Adjust the opening of the valve at the sample
water out of the detector.
9. Operation check
• Make sure that the system is free of defects.
• For details of parameter settings, refer to
chapter 4.
3.1.2 Converter Operation Panel
Operation Key
Operation Key
([*]: To enter the operation level
from measurement mode)
LCD Screen
Contact Status LED
Turbidity Unit Indication
F3-2E.ai