![YMGI WMMS-09ES-V2B2 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/ymgi/wmms-09es-v2b2/wmms-09es-v2b2_installers-instruction-and-users-manual_3603957031.webp)
YMGI, Engineered Comfort Products for A Sustainable and Efficient Green World!
YMGI: Your Modern Green Idea
31
5
Push the crimped contact into
the socket of the plug insulator
until it engages. Pull lightly on
the lead to check that the metal
part has engaged.
6
Insert the test pin with the
corresponding side into the
socket, or plug to the end
position. If the contact is
correctly assembled, the white
marking on the test pin will be
visible.
7
Screw on the cable nut, hand-
tighten.
The torque must be adapted to
the solar cables used
individually. Typical values are
between 2.5Nm to 3Nm
8
Push the couplers together until
they lock. Check for correct
engagement by tugging on the
coupling
.
9
Compress the two snap-in
springs (x) by hand or use the
PV-MS tool to separate the
coupling.
10
To Plug together:
Mount the plug connection until
it engages. Check to make sure
it is locked in place by tugging
on the coupling.
To unplug the connection you
will need the PV-MS tool