YG125-25 Maintenance Manual Electrical starting control system
Maintenance of electrical starting control system
1.
Turn on ignition switch and flameout switch to
check electrical start whether energize.
2.
Check fuse whether is burned.
3.
Dismantle headlamp holder to check holder
whether there is current.
4.
Dismantle meter bolt to check it whether is loose or
damaged.
5.
Dismantle meter bolt and odometer cable to check
bolt whether is damaged or loose.
6.
Take off meter to check odometer, tachometer and
fuel meter whether are damaged.
Fuse whether
141
Содержание YG125-25
Страница 39: ...YG125 25 Maintenance Manual Fuel system 4 Fuel system Fuel tank Throttle valve body Air filter 39...
Страница 44: ...YG125 25 Maintenance Manual Removal and installation of engine 5 Removal and installation of engine 44...
Страница 98: ...YG125 25 Maintenance Manual Frame and exhaust system 10 Frame and exhaust system 102...
Страница 115: ...YG125 25 Maintenance Manual Rear wheel and rear suspension device 12 Rear wheel and rear suspension device 119...
Страница 130: ...YG125 25 Maintenance Manual Illumination signal system Circuit schematic drawing 134...
Страница 144: ...YG125 25 Maintenance Manual Electrical System Diagram 19 Electrical System Diagram 148...