YG125-25 Maintenance Manual Crankcase, crankshaft and Shift mechanism
Removal and installation of crankcase
No.
Procedure
Quantity
Remarks
Removing order
Installation is in the reverse order of removal
1
Right hand crankcase
1
2
Pin
1
3
Pad
1
4
O-ring
1
5
engine oil filter net
1
6
Release oil bolt
1
7
Pad
1
8
Left hand crankcase
1
9
O-ring
1
10
Double head bolt
1
11
Main gear plate
1
12
Bolt M6*16
1
13
Pin 10*14
2
14
BOLT,FLG M6*40
7
15
BOLT,FLG M6*45
1
16
BOLT,FLG M6*70
7
Disassembly and assembly of left hand crankcase
90
Содержание YG125-25
Страница 39: ...YG125 25 Maintenance Manual Fuel system 4 Fuel system Fuel tank Throttle valve body Air filter 39...
Страница 44: ...YG125 25 Maintenance Manual Removal and installation of engine 5 Removal and installation of engine 44...
Страница 98: ...YG125 25 Maintenance Manual Frame and exhaust system 10 Frame and exhaust system 102...
Страница 115: ...YG125 25 Maintenance Manual Rear wheel and rear suspension device 12 Rear wheel and rear suspension device 119...
Страница 130: ...YG125 25 Maintenance Manual Illumination signal system Circuit schematic drawing 134...
Страница 144: ...YG125 25 Maintenance Manual Electrical System Diagram 19 Electrical System Diagram 148...