SHINGLES - RIDGE CAP

continued...

Continue installing ridge cap to back of roof.

Make sure there is 4" between the shingle-color and edge of shingles.

When you have 4" minimum of shingle color cut one piece to cap your roof.

Install fl ush to shingles.

4

5

6

7

(2) Nails per side.

You have fi nished your ridge cap.

FINISH

Cut at top of rain slot.

Flush to shingles

Trim cap off fl ush to shingles

Cap

4"

(10 cm)

Содержание FAIRFIELD GABLE 10 x 10

Страница 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Страница 2: ...This page intentionally left blank...

Страница 3: ...ervice Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...or paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT This floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floo...

Страница 6: ...5 1 4 5 1 x 10 2 x 191 1 cm ECN x2 3 8 x 5 7 8 x 45 3 8 1 x 14 9 x 115 3 cm 19 32 x 3 x 72 1 5 x 7 6 x 183 cm x1 ZJ 1 x 3 x 72 1 6 x 7 6 x 182 9 cm x1 HJ x4 19 32 x 3 x 26 5 8 1 5 x 7 6 x 67 6 cm AH x...

Страница 7: ...12 1 2 1 x 20 3 x 31 8 cm x6 x3 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 1 x 4 x 96 2 5 x 10 2 x 243 8 cm x1 KP WALL PANEL DOORS PARTS LIST x6 3 8 x 48 x 76 1 x 121...

Страница 8: ...60 6 cm x1 Treated lumber is stamped x9 2 x 4 x 17 1 2 5 x 10 x 44 5 cm TREATED x2 2 x 4 x 48 5 x 10 x 122 cm TREATED x2 2 x 4 x 72 5 x 10 x 183 cm TREATED 2 x 4 x 93 5 x 10 x 236 2 cm x9 TREATED 2 x...

Страница 9: ...est results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE Leveling higher th...

Страница 10: ...l sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs...

Страница 11: ...x1 2 x 4 x 96 5 x 10 x 244 cm TREATED x1 2 x 4 x 48 5 x 10 x 122 cm TREATED x1 2 x 4 x 24 5 x 10 x 61 cm TREATED x9 2 x 4 x 17 1 2 5 x 10 x 44 5 cm TREATED BEGIN You will build two floor sections HINT...

Страница 12: ...236 2 cm TREATED x1 2 x 4 x 96 5 x 10 x 244 cm TREATED x1 2 x 4 x 48 5 x 10 x 122 cm TREATED x1 2 x 4 x 24 5 x 10 x 61 cm TREATED HINT For easier nailing stand on frame 48 72 8 40 56 72 88 104 24 96 1...

Страница 13: ...IRED Flush Flush FLOOR FRAME x60 Attach floor sections together as shown using 3 nails 3 You have finished your floor frame Proceed to level and square frame FINISH 120 305 cm 116 1 2 295 9 cm 4 Nails...

Страница 14: ...proximately 167 1 4 424 8 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the f...

Страница 15: ...rement will be approximately 167 5 16 425 cm Attach the 48 x 96 panel with the 48 edge and corner flush to the outside of the floor frame Fig A and 3 4 along the floor joist Use the GAA gauge block fo...

Страница 16: ...ling the remaining panels in the following order 1 48 x 96 2 20 1 2 x 96 3 23 7 8 x 96 4 20 1 2 x 23 7 8 Maintain 3 4 measurement along edge of panel using the 3 4 Gauge Block Secure panels using 2 na...

Страница 17: ...the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure durin...

Страница 18: ...4 x 4 7 8 5 1 x 10 2 x 12 4 cm BEGIN 1 Secure one CLA flush to the floor deck using two 3 screws Measure over 120 3 4 and install a second CLA Secure using two 3 screws 120 3 4 306 7 cm Fig A You wil...

Страница 19: ...using glue and 12 2 nails No need to use jig for 2nd gusset 3 2 BEGIN 1 1 5 8 4 1 cm Screw 120 3 4 306 7 cm Place two rafters ECN into the jig as shown Keep ECN firm against outside CLA s as shown Fig...

Страница 20: ...9 cm GAP 1 4 1 9 cm GAP ECN x2 ECN x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Gable end...

Страница 21: ...m AM x1 7 16 x 3 x 67 1 1 x 7 6 x 170 2 cm OSB Glue both sides Build Door Header with OSB in the middle use 3 Nails Glue both sides of OSB 1 BEGIN You have assembled your door header FINISH 1 OSB ASSE...

Страница 22: ...62 2 cm 24 1 2 62 2 cm x1 Pre Assembled Header Pre Assembled Header BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nails at each mark x2 2 x 4 x 24 1 2 5 1 x 10 2 x 62 2 cm KHA 104 1...

Страница 23: ...frame flush to top as shown Secure panels with 2 nails 6 apart 2 Install all panels with primed side up 48 x 76 121 9 x 193 cm x1 LEFT x1 RIGHT Maintain Flush Maintain Flush Flush 6 15 2 cm For squar...

Страница 24: ...Attach temporary support HJ to frame as shown using 3 screws 4 3 You have finished building your front wall FINISH Maintain Flush HJ Flush Flush Maintain Flush Primed side up Primed side up 6 15 2 cm...

Страница 25: ...cm 44 1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm 113 287 cm x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 2 x 4 x 44 1 2 5 1 x 10 2 x 113 cm STL TOE...

Страница 26: ...D x122 2 5 1 cm 48 x 76 121 9 x 193 cm x2 3 4 GAUGE BLOCK You have finished building your back wall FINISH Carefully flip the back wall over 3 4 GAUGE BLOCK BEGIN HERE For squareness maintain flush an...

Страница 27: ...TM 25 LEFT WALL 3 7 6 cm Nails TOENAILING DOOR TM x6 TJ CPB TP RL 1 1 2 3 8 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nails at each ma...

Страница 28: ...26 LEFT WALL 48 x 76 121 9 x 193 cm x2 12 30 5 cm 12 30 5 cm 3 4 GAUGE BLOCK You have finished building your left wall FINISH Carefully flip the left wall over BEGIN HERE For squareness maintain flush...

Страница 29: ...TM 27 RIGHT WALL 3 7 6 cm Nails TOENAILING DOOR TM x6 TJ CPB TP RL 1 1 2 3 8 cm 72 182 9 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nail...

Страница 30: ...HT WALL 12 30 5 cm 12 30 5 cm 48 x 76 121 9 x 193 cm x2 You have finished building your right wall FINISH Carefully flip the right wall over 3 4 GAUGE BLOCK 48 122 cm 48 122 cm 20 5 8 52 4 cm 6 15 2 c...

Страница 31: ...ck wall bottom plates to floor using 3 nails Fig A 3 7 6 cm x10 x2 x30 BACK WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate BEGIN Center back wall assembly on the 120 304 8 cm floor dim...

Страница 32: ...FRAMES ARE FLUSH 2 Nail lower edge of left wall panels to floor using 2 nails 6 apart Angle nail to hit floor frame Fig B ENSURE LEFT AND BACK WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Flush Fig...

Страница 33: ...r left wall FINISH Secure left wall to floor using 3 nails Fig C Nail back wall panel to left wall stud using 1 1 2 nails 6 apart Fig C 3 Secure back wall top frame 2 x 4 using 3 screw toe screwed int...

Страница 34: ...ION PARTS REQUIRED 2 5 1 cm x2 2 5 1 cm x23 BEGIN Flush 2 5 1 cm Screw 2 5 1 cm Screw Fig A 2 5 1 cm Screw Flush ENSURE RIGHT AND BACK WALL PANEL ARE FLUSH BEFORE SECURING 20 5 8 x 76 PANEL GOES TO TH...

Страница 35: ...installing your right wall Secure bottom plate to floor using 3 nails Fig C Nail back wall panel to right wall stud using 1 1 2 nails 6 apart Fig C FINISH 3 1 1 2 3 8 cm Nails Fig D 3 7 6 cm Screw Fig...

Страница 36: ...ALL INSTALLATION 2 5 1 cm x4 x24 1 1 2 3 8 cm Fig A Flush Panel Flush 2 7 6 cm Screw 2 7 6 cm Screw 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush D O O R BEGIN Center front wall assembly on the floor 1 Na...

Страница 37: ...ail to hit floor frame Fig B 4 Secure front wall bottom plates to floor using 3 nails Fig B Secure front wall top plate using one 3 screw toe screwed into left and right top plates at an angle as show...

Страница 38: ...GIN 1 24 61 cm 24 61 cm 24 61 cm 21 53 3 cm 24 3 8 61 9 cm Align over studs Fig A Fig B Tight to side wall 3 3 7 6 cm Screws Flush to outside of panel Secure rafters to top plate with two 3 screws abo...

Страница 39: ...mporary supports OO and GAA as shown Tighten securely OO GAA OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4 Bottom edges Flush 1 x 3 x 5 2...

Страница 40: ...2 3 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using th...

Страница 41: ...d securing your door and trim FINISH 2 Attach GPL and GPR first then lower horizontal door rails with 3 4 screws 3 Center trim ZJ over doors and secure using five 2 finish nails 4 Install metal thresh...

Страница 42: ...t and right doors as shown Fig A B Secure using 7 2 screws through outside trim into OO Fig B 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Fig A Center OO in door opening OO x2 1 1 2 x 2 1 2 x...

Страница 43: ...ocation of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You h...

Страница 44: ...42 DOOR HARDWARE PARTS REQUIRED RIGHT DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws Secure handle with 1 1 4 screws as shown x1 1 1 4 x2 Handle locking with Screws...

Страница 45: ...on flat Measure distance from over door trim to top plate Fig A Orient BJC on flat as shown Transfer the measurement from Fig A onto the left front gable panel Place left front gable panel at measurem...

Страница 46: ...e panel flush to installed center panel Ensure panels are flush Secure panel to BJC using 1 1 2 nails You have finished assembling your front gable unit FINISH Flush Flush Maintain Flush 1 3 4 4 5 cm...

Страница 47: ...finished attaching your front gable FINISH Working inside secure gable unit with 3 screws toe screwed into BJC at an angle as shown in Fig B 2 5 1 cm x41 Center front gable unit on front wall top plat...

Страница 48: ...shown Place left front gable panel as shown and secure using 1 1 2 nails 1 BEGIN 2 3 Place second BJC as shown under center panel as shown Ensure panels are flush Secure panel to installed BJC using 1...

Страница 49: ...Fig A Fig B TOP PLATE 6 15 2 cm SPACED EVENLY 2 5 1 cm Nails BEGIN 1 2 You have finished attaching your front gable Working inside secure gable unit with 3 screws toe screwed into BJC at an angle as...

Страница 50: ...ark locations of four CLA as shown place ECA on top Secure using 3 screws as shown Fig A Ensure parts are flush along edges 2 3 4 1 BEGIN x4 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x8 2 x 4 x 4 7 8 5...

Страница 51: ...assembly Attach roof panels using 2 nails 6 apart Note panel over hangs ladder 3 4 1 9 cm along edge Fig D 7 16 x 8 5 8 x 27 1 4 1 1 x 21 9 x 69 2 cm 7 16 x 8 5 8 x 48 1 1 x 21 9 x 121 9 cm 3 4 1 9 cm...

Страница 52: ...unit Ensure gable unit is ush against installed gable unit at the top Secure right and left gable unit s framing to rafter using 3 screws as shown Fig C 2 1 BEGIN Place the left gable unit onto rafte...

Страница 53: ...ds Fig A Secure panel with two 2 nails in the corners 2 Attach a 20 5 8 x 27 1 4 roof panel flush to the installed panel and flush to the rafter bottom ends Fig A Secure panel with two 2 nails in the...

Страница 54: ...of the rafters 20 1 4 51 4 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm Fig B 2 Nails 3 4 1 9 cm Gauge Block Fig C 27 1 4 x 48 Flush Flush 4 Attach a 27 1 4 x 48 roof panel with a 3 4 measurement on the ra...

Страница 55: ...ecure panel with two 2 nails in the corners 3 4 1 9 cm Gauge Block Fig C 7 16 x 27 1 4 x 48 1 1 x 69 2 x 121 9 cm x1 7 16 x 20 5 8 x 48 1 1 x 55 6 x 121 9 cm x1 27 1 4 x 48 Flush Flush Two Nails Flush...

Страница 56: ...12 30 5 cm You have finished installing your roof panels 9 FINISH Repeat STEPS 1 8 to attach roof panels on the opposite side 7 Secure top of each lower panel using one 2 nail into each rafter as sho...

Страница 57: ...flush at peak Fig C Secure panels with 2 finish nails x2 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm x40 2 5 1 cm 1 BEGIN You have finished installing your soffit panels FINISH Ensure soffit panels are f...

Страница 58: ...8 2 finish nails two in each rafter Ensure soffit panels are flush at rafter ends Fig B and flush at seam x28 2 5 1 cm 1 BEGIN You have finished installing your eave side soffit panels FINISH x2 3 8 x...

Страница 59: ...ecure using 2 finish nails into rafter ends You have finished installing your eave side fascia FINISH 1 BEGIN Ensure fascia panels are flush at seam Fig B DOOR PARTS REQUIRED Primed Side Out 2 5 1 cm...

Страница 60: ...hout 3 1 4 x 5 7 8 shim 3 You have installed your gable trim FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm Primed Side Out Fig C...

Страница 61: ...ils You have attached your corner trim 73 7 8 187 6 cm on eave walls 74 1 2 189 2 cm on gable wall Fig B Fig A Flush under gable panel 74 1 2 189 2 cm Seam is flush Caulk seam before painting trim 73...

Страница 62: ...ft side Secure shelf supports at shown height with three 2 5 1 cm nails 1 BEGIN 2 x18 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x6 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 PARTS REQUIRED AE x5 x1 2...

Страница 63: ...s at each support as shown 3 FINISH You have finished installing your shelf 4 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x 60 6 cm x1 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x 4 x 23 7 8 2 5 x 10 2 x 60...

Страница 64: ...lue across RL and TP as shown Fig A Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm Glue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 5 Assemble joist with 3 nails in a stagge...

Страница 65: ...5 1 x 10 2 x 304 8 cm x1 Pre Assembled Loft Joist 7 8 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure joist...

Страница 66: ...oad not to exceed 400 lbs 181 kg evenly distributed across loft FINISH You have finished installing your loft 8 20 3cm 2 5 1 cm Nails Flush Flush 9 Install loft panel centered over loft joists Secure...

Страница 67: ...IN Position and level collar tie on 3rd rafter from back HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing y...

Страница 68: ...ttach window using 8 3 4 screws as shown Fig A 3 4 1 9 cm Screws HINT Caulk behind frame near edge before installing Fig A Seal window behind flange edges with high quality exterior grade caulk before...

Страница 69: ...and install window trim over transom window using 2 finish nails x2 19 32 x 2 1 2 x 32 3 4 1 5 x 6 3 x 83 1 cm YR 2 Finish Nails x2 19 32 x 2 1 2 x 9 1 5 x 6 3 x 22 8 cm EY YR Mark Center Center of W...

Страница 70: ...walls for vent locations Measure and mark vent hole in wall as shown Cut out marked opening Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your wall vent x12 1...

Страница 71: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 72: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 73: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 74: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 75: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 76: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 77: ...This page intentionally left blank...

Страница 78: ...olas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola...

Отзывы: