![Yardline FAIRFIELD GABLE 10 x 10 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/yardline/fairfield-gable-10-x-10/fairfield-gable-10-x-10_manual_3174642051.webp)
49
FRONT GABLE LADDERS
You have fi nished building your gable assemblies.
FINISH
2" (5,1 cm)
x56
2" (5,1 cm)
Nails
5
Flush
Flush
Panel overhang = 3/4"
Arrange ladders and roof panels as shown
(Fig. C)
to make a right and a left gable assembly.
Attach roof panels using 2" nails 6" apart.
Note - panel over hangs ladder 3/4" (1,9 cm) along edge.
Fig. D
7/16 x 8-5/8 x 27-1/4"
(1,1 x 21,9 x 69,2 cm)
7/16 x 8-5/8 x 48"
(1,1 x 21,9 x 121,9 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
Flush
Left
Right
Right
Assembly
Left
Assembly
END VIEW
6"
(15,2 cm)
7/16 x 8-5/8 x 27-1/4"
7/16 x 8-5/8 x 48"
PARTS REQUIRED:
x2
x2
x2
x2
Left Ladder Frame
Right Ladder Frame
NOTE: Install OSB with the rough side up
Содержание FAIRFIELD GABLE 10 x 10
Страница 2: ...This page intentionally left blank...
Страница 77: ...This page intentionally left blank...