x1
x1
1 x 3 x 72" (2,5 x 7,6 x 182,9 cm)
65
PARTS REQUIRED:
COLLAR TIE
FINISH
2
1
BEGIN
Position and level
collar tie
on 3rd rafter from back.
HINT:
For best appearance install
collar tie
on rafter facing away from door opening.
Attach with 2" nails as shown.
You have fi nished installing your collar tie.
3rd Rafter
HJ
x6
2" (5,1 cm)
Flush
Flush
2" (5,1 cm) Nails
LEVEL
HJ
LOFT
Содержание FAIRFIELD GABLE 10 x 10
Страница 2: ...This page intentionally left blank...
Страница 77: ...This page intentionally left blank...