![Yardline FAIRFIELD GABLE 10 x 10 Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/yardline/fairfield-gable-10-x-10/fairfield-gable-10-x-10_manual_3174642052.webp)
50
FRONT GABLE OVERHANG
PARTS REQUIRED:
Fig. B
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
3" (7,6 cm)
Screws
3" (7,6 cm)
Screws
You have fi nished installing your gable units.
FINISH
2" (5,1 cm)
x28
Repeat STEP-1 for right gable unit.
Ensure gable unit is fl ush against installed gable unit at the top.
Secure right and left gable unit's framing to rafter using 3" screws as shown
(Fig. C)
2
1
BEGIN
Place the left gable unit onto rafter as shown
(Fig. A)
.
Ensure gable unit is fl ush against gable panel, fl ush at peak
(Fig. B)
.
Secure gable unit panel to rafter using 2" nails 6" apart
(Fig. A)
.
3" (7,6 cm)
x14
Fig. A
Fig. C
Flush
6"
(15,2 cm)
6"
(15,2 cm)
Flush
Содержание FAIRFIELD GABLE 10 x 10
Страница 2: ...This page intentionally left blank...
Страница 77: ...This page intentionally left blank...