![Yardline FAIRFIELD GABLE 10 x 10 Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/yardline/fairfield-gable-10-x-10/fairfield-gable-10-x-10_manual_3174642058.webp)
56
PARTS REQUIRED:
EAVE SIDE SOFFITS
Position
72-3/4"
and
45-3/8"
soffi t panel primed side down, fl ush to front gable soffi t
and rafter ends
(Fig A)
.
Toenail at center seam
(Fig. C)
. Secure using (8) 2" fi nish nails, two in each rafter.
Ensure soffi t panels are fl ush at rafter ends (Fig. B) and fl ush at seam
.
x28
2" (5,1 cm)
1
BEGIN
You have fi nished installing your eave side soffi t panels.
FINISH
x2
3/8 x 5-7/8 x 45-3/8" (1 x 14,9 x 115,3 cm)
Primed Side Down
Fig. A
2" (5,1 cm) Nails
Flush
Fig. B
Fig. C
Flush
Flush at seam
TOENAILING
x2
3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm)
Seam
45-3/8"
72-3/4"
Содержание FAIRFIELD GABLE 10 x 10
Страница 2: ...This page intentionally left blank...
Страница 77: ...This page intentionally left blank...