3 - 12
CHK
ADJ
ADJUSTING THE VALVE CLEARANCE
c. Round off the original valve pad number
according to the following table.
Last digit
Rounded value
0 or 2
0
5
5
8
10
EXAMPLE:
Original valve pad number
= 148 (thickness =1.48 mm)
Rounded value = 150
d. Locate the rounded number of the original
valve pad and the measured valve clear-
ance in the valve pad selection table. The
point where the column and row intersect is
the new valve pad number.
NOTE:
@
The new valve pad number is only an approxi-
mation. The valve clearance must be mea-
sured again and the above steps should be
repeated if the measurement is still incorrect.
e. Install the new valve pad
1
and the valve
lifter
2
.
NOTE:
@
• Lubricate the valve pad with molybdenum
disulfide grease.
• Lubricate the valve lifter with molybdenum
disulfide oil.
• The valve lifter must turn smoothly when
rotated by hand.
• Install the valve lifter and the valve pad in the
correct place.
f. Install the exhaust and intake camshafts,
timing chain and camshaft caps.
T
R
.
.
Camshaft cap bolt
10 Nm (1.0 m · kg, 7.2 ft · lb)
Содержание YZF-R1P 2001-2003
Страница 1: ......
Страница 2: ......
Страница 3: ...YZF R1P YZF R1PC SERVICEMANUAL LIT 11616 15 47 5PW 28197 10...
Страница 4: ......
Страница 9: ......
Страница 75: ...2 25 SPEC COOLING SYSTEM DIAGRAMS EAS00033 COOLING SYSTEM DIAGRAMS 1 Radiator fan 2 Radiator 3 Water pump...
Страница 77: ...2 27 SPEC COOLING SYSTEM DIAGRAMS 1 Water pump 2 Radiator cap 3 Thermostat 4 Thermostat housing...
Страница 78: ...2 28 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator...
Страница 83: ...2 33 SPEC LUBRICATION DIAGRAMS 1 Main axle 2 Oil delivery pipe 3 Drive axle...
Страница 84: ...2 34 SPEC LUBRICATION DIAGRAMS 1 Cylinder head 2 Crankshaft...
Страница 439: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...