5 - 70
ENG
CONNECTING RODS AND PISTONS
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
The following procedure applies to all of the
connecting rods.
CAUTION:
@
Do not interchange the big end bearings
and connecting rods. To obtain the correct
crankshaft-pin-to-big-end-bearing clear-
ance and prevent engine damage, the big
end bearings must be installed in their orig-
inal positions.
a. Clean the big end bearings, crankshaft pins,
and the inside of the connecting rod halves.
b. Install the big end upper bearing into the
connecting rod and the big end lower bear-
ing into the connecting rod cap.
NOTE:
@
Align the projections
a
on the big end bear-
ings with the notches
b
in the connecting rod
and connecting rod cap.
c. Put a piece of Plastigauge
®
1
on the crank-
shaft pin.
d. Assemble the connecting rod halves.
NOTE:
@
• Do not move the connecting rod or crank-
shaft until the clearance measurement has
been completed.
• Lubricate the bolts threads and nut seats
with molybdenum disulfide grease.
• Make sure that the “Y” mark
c
on the con-
necting rod faces towards the left side of the
crankshaft.
• Make sure that the characters
d
on both the
connecting rod and connecting rod cap are
aligned.
Содержание YZF-R1P 2001-2003
Страница 1: ......
Страница 2: ......
Страница 3: ...YZF R1P YZF R1PC SERVICEMANUAL LIT 11616 15 47 5PW 28197 10...
Страница 4: ......
Страница 9: ......
Страница 75: ...2 25 SPEC COOLING SYSTEM DIAGRAMS EAS00033 COOLING SYSTEM DIAGRAMS 1 Radiator fan 2 Radiator 3 Water pump...
Страница 77: ...2 27 SPEC COOLING SYSTEM DIAGRAMS 1 Water pump 2 Radiator cap 3 Thermostat 4 Thermostat housing...
Страница 78: ...2 28 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator...
Страница 83: ...2 33 SPEC LUBRICATION DIAGRAMS 1 Main axle 2 Oil delivery pipe 3 Drive axle...
Страница 84: ...2 34 SPEC LUBRICATION DIAGRAMS 1 Cylinder head 2 Crankshaft...
Страница 439: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...