4-70
CRANKCASE AND CRANKSHAFT
ENG
3. Install:
9
O-ring
1
To crankcase (right)
2
.
5. Install:
9
Dowel pin
1
9
Crankcase (right)
2
To crankcase (left)
3
.
NOTE:
9
Fit the crankcase (right) onto the crankcase
(left). Tap lightly on the case with soft hammer.
9
When installing the crankcase, the connecting
rod should be positioned at TDC (top dead
center).
6. Install:
9
Bolt (crankcase)
1
NOTE:
Tighten the crankcase tightening bolts in stage,
using a crisscross pattern.
NOTE:
Clean the contacting surface of crankcase (left
and right) before applying the sealant.
4. Apply:
9
Sealant
On the crankcase (right)
1
.
Quick gasket
®
:
ACC-QUICK-GS-KT
Yamaha bond No. 1215:
90890-85505
14 Nm (1.4 m•kg, 10 ft•lb)
5UP-9-30-4C 5/24/02 5:33 PM Page 42