5-44
CHAS
HANDLEBAR
10. Install:
9
Bolt (grip cap)
1
w
9
Install the grip cap so that the gaps
a
a
and
b
b
between the bolt (grip cap) and brake
lever
2
2
are equal. If you make a mistake in
the grip cap installation position, the brake
lever may contact the grip cap, resulting in
poor brake performance.
9
After tightening the bolts, check that the
throttle grip
3
3
moves smoothly. If it does
not, retighten the bolts for adjustment.
11. Install:
9
“ENGINE STOP” button
1
9
Clutch lever holder
2
9
Bolt (clutch lever holder)
3
9
Clamp
4
NOTE:
9
The “ENGINE STOP” button, clutch lever hold-
er and clamp should be installed according to
the dimensions shown.
9
Pass the “ENGINE STOP” button lead in the
middle of the clutch holder.
12. Install:
9
Clutch cable
1
NOTE:
Apply the lithium soap base grease on the clutch
cable end.
13. Adjust:
9
Clutch lever free play
Refer to “CLUTCH ADJUSTMENT” section in
the CHAPTER 3.
4 Nm (0.4 m•kg, 2.9 ft•lb)
4 Nm (0.4 m•kg, 2.9 ft•lb)
Содержание YZ125(R)/LC
Страница 128: ...3 3 INSP ADJ MEMO...
Страница 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2...
Страница 566: ...TUN MEMO...
Страница 567: ......