5-8
Chapter
5
SPECIFICA
TIONS
3. Dedicated input/output signal timing chart
3.1 Initial data process for CC-Link connection
a)
b)
c)
d)
e)
on
on
off
on
off
on
off
on
off
off
RX (n+7) 8
Initial data process request flag
RX (n+7) B
Remote Ready
RYn0:SI(00)
Emergency stop input
RY(n+1)1:SI(11)
Interlock input
RY(n+7)8
Initial data process complete flag
c
CAUTION
• The dedicated input ON/OFF process from the master station PLC to the
controller must be carried out at an interval of 100ms or more. If the interval is
too short, the dedicated input may not be recognized. (This also applies to the
same dedicated input and differing dedicated input intervals.)
• If dedicated outputs are provided for the dedicated inputs from the master
station PLC to controller, use them.
Confirmation of connection with master station PLC at power ON
a) Initial data process request flag ON is output
b) Emergency stop and interlock input ON is input
c) Initial data process complete flag ON is input
d) Initial data process request flag OFF is output
e) Remote Ready ON is output
Connection with the CC-Link system is completed with this process.
* This process is always required to correctly connect to the CC-Link system.
* To enter the emergency stop state, turn RYn0:SI(00) OFF after the above process is
established.
* The servo is OFF when the controller power is turned ON.
3. Dedicated input/output signal timing chart
Содержание RCX series
Страница 1: ...User s Manual ENGLISH E E78 Ver 1 08 CC Link YAMAHA NETWORK BOARD RCX series ...
Страница 2: ......
Страница 12: ......
Страница 22: ......
Страница 34: ...2 12 MEMO ...
Страница 36: ......
Страница 50: ......
Страница 60: ......
Страница 81: ...Chapter 6 APPENDIX Contents 1 Term definition 6 1 ...
Страница 82: ......