INSP
ADJ
L-62
STEERING HEAD INSPECTION
• Check the Steering Stem by Turning it Lock to
Lock. If there is any binding, remove the Steer-
ing Stem Assembly and inspect the Steering
Bearings.
Refer to “STEERING HEAD AND HANDLE-
BAR” section in Chapter 6 Page no 6-29
• Install the Damper Rubber  and Ring Nut Á
(upper), then align the slots of both Ring Nut
à (lower) and tighten the other until they are
aligned.
• Install the Lock Washer À
NOTE :
Make sure the lock washer tab is placed in the
slots.
6. Install :
• Handle crown ¿ with Spacer
• Handle Crown bolt À
• Handlebar Lower Holder Á
• Handlebar Â
• Handlebar upper holder Ã
• Bolts (handlebar upper holders) Ä
• Bands Å
3-23
NOTE :
Set the Torque Wrench to the Ring Nut Wrench
so that they form a right angle.
WARNING
Avoid over torquing.
Ring nut-lower (final tightening) :
15.5 Nm (1.55 m.kg, 11.2 ft. lb)
Bolts (handle crown and inner tube)
23 Nm (2.3 m.kg, 25 ft.lb)
Bolt (handle crown and steering
shaft)
35 Nm (3.5 m. kg, 25 ft.lb)
Bolts (handlebar upper holder)
23 Nm (2.3 m. kg, 17 ft. lb)