5-59
ENG
INSPECTION
1. Inspect:
• Piston wall
• Cylinder wall
Vertical scratches
→
Replace the crankcase,
and replace the piston and piston rings as a
set.
2. Measure:
• Piston-to-cylinder clearance
Measurement steps:
1st step:
• Measure cylinder bore “C” with the cylinder bore
gauge
1
.
NOTE:
Measure cylinder bore “C” by taking side-to-side
and front-to-back measurements of the cylinder.
Then, find the average of the measurements.
Cylinder bore “C”
82.000 ~ 82.010 mm
(3.2283 ~ 3.2287 in)
Taper limit “T”
0.050 mm (0.0020 in)
Out of round “R”
0.050 mm (0.0020 in)
• If out of specification, replace the crankcase,
and the piston and piston rings as a set.
“C” = maximum of D
1
~ D
6
“T” = maximum of D
1
or D
2
– maximum of D
5
or D
6
“R” = maximum of D
1
D
3
or D
5
– maximum of
D
2
D
4
or D
6
Содержание FX10X 2008
Страница 2: ......
Страница 312: ...7 36 FI ...
Страница 333: ...8 21 ELEC CHARGING SYSTEM ...
Страница 341: ...8 29 ELEC LIGHTING SYSTEM ...
Страница 400: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 402: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 406: ......
Страница 407: ......