3-9
CHAS
Order
Job name/Part name
Q’ty
Remarks
15
Throttle cable holder
1
16
Throttle cable
1
Disconnect.
17
Right handlebar switch/throttle lever
assembly
1
18
Upper handlebar holder
2
19
Handlebar
1
20
Steering joint
1
NOTE:
After installing all parts, refer to “CABLE
ROUTING” in CHAPTER 9, to check the
cable and lead routing.
For installation, reverse the removal proce-
dure.
(4)
É
18
2
20
10 Nm (1.0 m
•
kg, 7.2 ft
•
lb)
23 Nm (2.3 m
•
kg, 17 ft
•
lb)
È
:
É
:
2
3
3
4
5
6
7
7
9
10
8
11
14
15
16
17
19
17
12
13
È
1
2
2
Содержание FX10X 2008
Страница 2: ......
Страница 312: ...7 36 FI ...
Страница 333: ...8 21 ELEC CHARGING SYSTEM ...
Страница 341: ...8 29 ELEC LIGHTING SYSTEM ...
Страница 400: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 402: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 406: ......
Страница 407: ......