4-10
POWR
TR
PRIMARY SHEAVE AND DRIVE V-BELT
• Loosen the primary sheave bolt completely.
• Retighten the primary sheave bolt to specifica-
tion.
T
R
.
.
Primary sheave bolt:
2nd:
60 Nm (6.0 m · kg, 43 ft · lb)
4. Adjust:
• V-belt position
Refer to “DRIVE V-BELT” in CHAPTER 2.
• Sheave offset
• Secondary sheave free play (clearance)
Refer to “SHEAVE OFFSET ADJUSTMENT”
in CHAPTER 2.
Содержание FX10X 2008
Страница 2: ......
Страница 312: ...7 36 FI ...
Страница 333: ...8 21 ELEC CHARGING SYSTEM ...
Страница 341: ...8 29 ELEC LIGHTING SYSTEM ...
Страница 400: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 402: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 406: ......
Страница 407: ......