8-19
–
+
ELEC
E
ELECTRICAL ANALYSIS
50, 60, 70 hp
75, 80, 90 hp
Pulser coil
Output peak voltage (minimum)
W/R – W/B
r/min
Cranking
1,500
3,500
Open
Connect
V
4.5
2.5
6.5
10
Pulser coil
Output peak voltage (minimum)
W/R – W/B
r/min
Cranking
1,500
3,500
Open
Connect
V
7.0
5.0
14
20
4. Lighting coil output:
1)
Connect the tester to the lighting
coil as shown.
2)
Set the tester dial to specification.
3)
Start the engine.
4)
Measure the lighting coil output.
5)
If the output is beyond specification,
replace rectifier/regulator.
6)
If the output is below specification,
replace lighting coil.
50, 60, 70 hp
75, 80, 90 hp
Lighting coil
Output peak voltage (minimum)
G – G/W
r/min
Cranking
1,500
3,500
Open
Connect
V
8.5
8.0
25
25
Lighting coil
Output peak voltage (minimum)
G – G/W
r/min
Cranking
1,500
3,500
Open
Connect
V
10
11
25
25
Содержание 50G
Страница 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Страница 6: ......
Страница 8: ......
Страница 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Страница 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Страница 20: ......
Страница 50: ......
Страница 69: ......
Страница 159: ......
Страница 198: ......
Страница 199: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 203: ......