7-19
E
BRKT
POWER TRIM AND TILT UNIT
7. Fit a new O-ring and the back-up ring on
the free-piston and install it into the cyl-
inder.
1
O-ring
2
Back-up ring
8. Fit a new O-ring and the back-up ring to
the tilt-piston and install it into the cylin-
der.
Fill the cylinder with hydraulic fluid and
tighten the end-screw to the specified
torque.
1
O-ring
2
Back-up ring
Cylinder end screw wrench:
YB-6175-2B/90890-06544
T
R
.
.
Tilt cylinder end screw:
80 Nm (8.0 m • kg, 58 ft • lb)
9. Align the connector-shaft keyway with
the motor-shaft projection and install
the motor with new O-ring.
10. Install the hydraulic-fluid reservoir with
new O-ring.
1
O-ring
11. Air bleeding. Refer to page 7-28.
T
R
.
.
Bolt (tilt motor):
4 Nm (0.4 m • kg, 2.9 ft • lb)
T
R
.
.
Bolt (reservoir body):
6 Nm (0.6 m • kg, 4.3 ft • lb)
Содержание 50G
Страница 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Страница 6: ......
Страница 8: ......
Страница 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Страница 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Страница 20: ......
Страница 50: ......
Страница 69: ......
Страница 159: ......
Страница 198: ......
Страница 199: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 203: ......