8-18
–
+
ELEC
E
ELECTRICAL ANALYSIS
50, 60, 70 hp
75, 80, 90 hp
Charge coil
Output peak voltage (minimum)
Br – L
r/min
Cranking
1,500
3,500
Open
Connect
V
120
150
160
120
Charge coil
Output peak voltage (minimum)
R – Br
r/min
Cranking
1,500
3,500
Open
Connect
V
55
60
170
150
Charge coil
Output peak voltage (minimum)
R – L
r/min
Cranking
1,500
3,500
Open
Connect
V
90
100
135
135
3. Pulser coil output:
1)
Disconnect the pulse coil couple.
Connect the 2 pins test harness.
2)
Connect the tester to the measure-
ment terminal.
3)
Set the tester dial to specification.
4)
Crank or start the engine.
5)
Measure the pulser coil output.
6)
If the output is beyond specification,
replace CDI unit.
7)
If the output is below specification,
replace pulser coil.
2 pins test harness:
YB-38831/90890-06767
Содержание 50G
Страница 1: ...6H2 28197 Z9 11 SERVICE MANUAL 50G 60F 70B 75C 90A ...
Страница 6: ......
Страница 8: ......
Страница 16: ...1 7 GEN INFO E SPECIAL TOOLS ...
Страница 18: ...1 9 GEN INFO E SPECIAL TOOLS ...
Страница 20: ......
Страница 50: ......
Страница 69: ......
Страница 159: ......
Страница 198: ......
Страница 199: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 203: ......