DIQ/S 281
Installation
53
ba76226e02
03/2023
Initial start phase
The Universal Transmitter is initialized during the first start phase. All compo-
nents are automatically registered with the Universal Transmitter DIQ/S 281.
The system then performs a self test. This process can take several seconds.
During this period, the following display appears:
figure 3-32 Display during the initialization process
Second start
phase
As soon as the Universal Transmitter is successfully initialized, the measured
value display appears. In the case of IQ sensors that are not yet providing mea-
sured values, "Init" appears temporarily
figure 3-33 Display after initialization of the terminal
If the system start failed, see chapter 8 W