background image

 

Service & Repair Manual

13

Copyright ©2008 XS Scuba

Second Stage Reassembly

WARNING: DO NOT attempt to use any other manu-
facturer's part as a substitute for any XS Scuba part, 
regardless of any similarity in shape, size, or appear-
ance.  Doing so may render the product unsafe, and 
could result in serious injury or death.

1.  Install the exhaust valve(25), if it was removed, into the 

second stage housing(13) by gently pulling the stem 

through the hole in the center of the sealing area, until the 

barb has passed through and is securely seated against 

the opposite side.

2.  Mate two seating tabs on one side of the exhaust deflec

-

tor(26) into two slots inside the inner groove of the  sec-

ond stage housing, and then press the opposite side until 

it snaps securely into place.

3.  Closely examine both sides of the white lever pad(14) to 

identify that the mounting tabs on both legs are rounded 

on one side and flat on the other.  (See Fig. 6.)   Hold 

the air barrel with the 

flat cut facing up

, and place the 

clip over the tube with the rounded side facing toward 

the flange, so that one tab engages in the hole next to it.  

Then, gently press the opposite leg into place so the the 

other tab engages in the opposite hole.  When done cor-

rectly, the lever pad should rest flush against the flange, 

with both tabs securely seated.  (See Fig. 7.)

CAUTION:  Do not stretch the legs of the plastic retain-
ing clip, or attempt to install it if damage or breakage 
has occurred.

4.  Insert the stem of the LP seat(16) into the large end of the 

poppet(17). DO NOT use adhesive.

5.  Lubricate and install the small O-ring(18) over the groove 

on the opposite end of the poppet, being careful to avoid 

stretching it excessively.  Examine the poppet's features 

to determine proper positioning.  (See Fig. 8.)

6.  While holding the air barrel with the 

flat cut facing straight 

down

, guide the poppet into the tube, LP seat first, with 

the ears facing straight down.  (See Fig. 9.)

NOTE:  To better control the orientation of the poppet 
inside the air barrel while the lever is being installed, 
XS  Scuba  recommends  using  the  Poppet  Align/ 
Orifice  Preset Tool  (P/N  20-785-400),  available  from 
Peter Built Co.  (See Fig. 10.)

Fig. 7 – Air barrel Orientation

Fig. 6 – Lever Pad Features

Fig. 9 – Correct Poppet Orientation

Fig. 8 – Poppet Features

Fig. 11 – Correct Venturi Deflector Orientation

Fig. 10 – Poppet Alignment/ Preset Tool

Содержание Airwave Octopus

Страница 1: ...Service Repair Manual rev 06 08 SERVICE AND REPAIR MANUAL AIRWAVE OCTO PN RG320...

Страница 2: ...External Inspection 6 Immersion Leak Test 6 Intermediate Pressure Test 7 Section 3 Disassembly Procedures General Guidelines 8 Section 4 Reassembly Procedures General Guidelines 12 Section 5 Final Tes...

Страница 3: ...product it is extremely critical that it receives service according to the procedures outlined in this manual on a regularly scheduled basis at least once a year with normal or infrequent use NOTE A...

Страница 4: ...sult from improper use of this tool Be sure to follow the instructions provided in this manual NOTE XS Scuba especially endorses and recommends the Jaws Gripmaster Bench Vise available from Peter Buil...

Страница 5: ...ol PN 20 500 200 Tech Driver IPG PN 20 165 111 O ring Tool Set PN 10 125 400 1 4 Slotted Screwdriver PN 11 465 500 1 4 Nut Driver PN 11 168 500 Small 02 Blade Screwdriver PN 11 133 500 Cristo Lube PN...

Страница 6: ...r damage that exposes the brass beneath the finish CAUTION Do not clean any parts that show damage to their finish inside an ultrasonic cleaner 4 Closely examine all parts of the first stage for any o...

Страница 7: ...xceeds 400 psi may result in damage or rupture of the test gauge or LP hose and could cause serious personal injury 2 Slowly open the supply valve to pressurize the first stage Closely monitor the IP...

Страница 8: ...ngs After passing close inspection static O rings may sometimes be reused although this is not necessarily recommended Dynamic O rings must be automatically discarded and replaced with every service r...

Страница 9: ...a n open end wrench turn the inlet fitting counter clockwise to loosen and unscrew it completely by hand to remove Closely examine the plastic threads and overall condition of the inlet fitting and re...

Страница 10: ...tor counter clockwise from the air barrel 15 and carefully remove the O ring 21 with a plastic tool 13 Turn the air barrel over to allow the balance shuttle cap 20 and LP spring 19 to drop out see Fig...

Страница 11: ...ace to keep it isolated from other metal parts 21 Gently pull the exhaust deflector 26 off from the second stage housing to expose the exhaust valve 25 for inspection 22 Closely inspect the exhaust de...

Страница 12: ...G 11 PN MS150 to be used exclusively for the lubrication and dressing of O rings and other internal parts Christo Lube provides superior lubrication to that of silicone grease especially in high press...

Страница 13: ...e tab engages in the hole next to it Then gently press the opposite leg into place so the the other tab engages in the opposite hole When done cor rectly the lever pad should rest flush against the fl...

Страница 14: ...te leg engages with the opposite side The lever should now be standing up when released pointing toward the venturi deflector See Fig 14 11 While holding the second stage housing right side up with th...

Страница 15: ...t clockwise while closely watching the lever When the lever starts to drop stop do not turn the orifice any further This will indicate that the orifice has made contact against the LP seat See Fig 20...

Страница 16: ...ate pressure exceeds 155 170 psi ensure that a fully assembled and properly adjusted second stage is connected to the first stage before pressurizing Failure to relieve intermediate pressure that exce...

Страница 17: ...justing Tool and mate the opposite fitting of the tool onto the inlet fitting of the second stage Pull back the knurled knob to retract the slotted drive and tighten the tool clockwise onto the inlet...

Страница 18: ...stage valve and may impair the regulator s performance 8 When the second stage is properly adjusted with no leaks or lever slack depressurize and purge the system to dis connect the LP hose 9 Reconne...

Страница 19: ...e to slower bubble formation that occurs in smaller leaks Disassemble the regulator at the source of the leak to check sealing surfaces assembly sequence and component positioning in order to correct...

Страница 20: ...ermediate pressure 1 Refer to first stage troubleshooting 2 Orifice incorrectly adjusted 2 Reset to preliminary setting and readjust 3 Lever is damaged 3 Replace with new 1 Lever is slack or orifice i...

Страница 21: ...rifice 10 RP320 10 1 O ring 11 RP320 11 1 Mouthpiece 12 RP320 12 1 Tie Strap 13 RP320 13 1 Housing 14 RP320 14 1 Lever Pad 15 RP320 15 1 Air Barrel 16 RP320 16 1 LP Seat 17 RP320 17 1 Poppet 18 RP320...

Отзывы: