XS Scuba Airwave Octopus Скачать руководство пользователя страница 14

AirWave Octo

14

AirWave Octo Service and Repair Manual

7.  Apply a light coat of lubricant to both ends of the poppet 

spring(4), and place the spring over the small end of the 

poppet, inside the air barrel.  Be careful not to disturb the 

the orientation of the poppet inside the air barrel.

8.  Insert the small end of the shuttle cap(20) into the end of 

the poppet spring.

9.  Install the O-ring(21) onto the groove of the venturi de-

flector(22).  Mate the deflector directly over the shuttle 

cap, and screw it clockwise by hand onto the air barrel 

until it stops.  Then, turn it back one full turn counter-

clockwise until the deflector vane is resting directly over 

the flat cut of the air barrel (see Fig. 11.).

10.  Closely examine both holes where the lever pad is in-

stalled, to ensure that the ears of the poppet are properly 

aligned as shown (see Fig. 12).  While holding the air 

barrel with the 

flat cut facing down

, insert one leg of the 

lever(6) into one hole, so that it engages with the poppet 

(see Fig. 13).  Being careful to avoid stretching or bend-

ing the lever, rotate it over the air barrel until the opposite 

leg engages with the opposite side.  The lever should 

now be standing up when released, pointing toward the 

venturi deflector.  (See Fig. 14.)

11.  While holding the second stage housing right side up with 

the mouthpiece tube facing you, slide the valve assembly 

into the opening in the right side of the housing.  Gently 

depress the lever, and then slide the valve assembly fully 

into place so that the lever pad is seated flush.  (See Fig. 

15.)

12.  Install the retaining clip(5) over the groove of the venturi 

deflector inside the housing, so that it snaps securely into 

place.  (See Fig. 16.)

13.  Install the O-ring(8) over the threaded inlet of the air bar-

rel, being careful to avoid stretching it or rolling over the 

threads.  Use a smooth instrument to ensure that it is 

seated at the base of the threads, against the wall of the 

housing.

14.  Mate the inlet fitting(7) over the threads of the air barrel, 

and turn it clockwise by hand until finger snug.  Apply a n" 

open end wrench to tighten it further by exactly 8 turn.

CAUTION:  Be careful to avoid overtightening the inlet 
fitting, which can crack if it is overtightened, requiring 
its replacement.

Fig. 13 – Lever Installation

Fig. 14 – Correct Lever Orientation

Fig. 12 – Poppet Correcty Installed

Fig. 15 – Valve Assembly Completely Installed

Fig. 16 – Installing Retaining Clip

Содержание Airwave Octopus

Страница 1: ...Service Repair Manual rev 06 08 SERVICE AND REPAIR MANUAL AIRWAVE OCTO PN RG320...

Страница 2: ...External Inspection 6 Immersion Leak Test 6 Intermediate Pressure Test 7 Section 3 Disassembly Procedures General Guidelines 8 Section 4 Reassembly Procedures General Guidelines 12 Section 5 Final Tes...

Страница 3: ...product it is extremely critical that it receives service according to the procedures outlined in this manual on a regularly scheduled basis at least once a year with normal or infrequent use NOTE A...

Страница 4: ...sult from improper use of this tool Be sure to follow the instructions provided in this manual NOTE XS Scuba especially endorses and recommends the Jaws Gripmaster Bench Vise available from Peter Buil...

Страница 5: ...ol PN 20 500 200 Tech Driver IPG PN 20 165 111 O ring Tool Set PN 10 125 400 1 4 Slotted Screwdriver PN 11 465 500 1 4 Nut Driver PN 11 168 500 Small 02 Blade Screwdriver PN 11 133 500 Cristo Lube PN...

Страница 6: ...r damage that exposes the brass beneath the finish CAUTION Do not clean any parts that show damage to their finish inside an ultrasonic cleaner 4 Closely examine all parts of the first stage for any o...

Страница 7: ...xceeds 400 psi may result in damage or rupture of the test gauge or LP hose and could cause serious personal injury 2 Slowly open the supply valve to pressurize the first stage Closely monitor the IP...

Страница 8: ...ngs After passing close inspection static O rings may sometimes be reused although this is not necessarily recommended Dynamic O rings must be automatically discarded and replaced with every service r...

Страница 9: ...a n open end wrench turn the inlet fitting counter clockwise to loosen and unscrew it completely by hand to remove Closely examine the plastic threads and overall condition of the inlet fitting and re...

Страница 10: ...tor counter clockwise from the air barrel 15 and carefully remove the O ring 21 with a plastic tool 13 Turn the air barrel over to allow the balance shuttle cap 20 and LP spring 19 to drop out see Fig...

Страница 11: ...ace to keep it isolated from other metal parts 21 Gently pull the exhaust deflector 26 off from the second stage housing to expose the exhaust valve 25 for inspection 22 Closely inspect the exhaust de...

Страница 12: ...G 11 PN MS150 to be used exclusively for the lubrication and dressing of O rings and other internal parts Christo Lube provides superior lubrication to that of silicone grease especially in high press...

Страница 13: ...e tab engages in the hole next to it Then gently press the opposite leg into place so the the other tab engages in the opposite hole When done cor rectly the lever pad should rest flush against the fl...

Страница 14: ...te leg engages with the opposite side The lever should now be standing up when released pointing toward the venturi deflector See Fig 14 11 While holding the second stage housing right side up with th...

Страница 15: ...t clockwise while closely watching the lever When the lever starts to drop stop do not turn the orifice any further This will indicate that the orifice has made contact against the LP seat See Fig 20...

Страница 16: ...ate pressure exceeds 155 170 psi ensure that a fully assembled and properly adjusted second stage is connected to the first stage before pressurizing Failure to relieve intermediate pressure that exce...

Страница 17: ...justing Tool and mate the opposite fitting of the tool onto the inlet fitting of the second stage Pull back the knurled knob to retract the slotted drive and tighten the tool clockwise onto the inlet...

Страница 18: ...stage valve and may impair the regulator s performance 8 When the second stage is properly adjusted with no leaks or lever slack depressurize and purge the system to dis connect the LP hose 9 Reconne...

Страница 19: ...e to slower bubble formation that occurs in smaller leaks Disassemble the regulator at the source of the leak to check sealing surfaces assembly sequence and component positioning in order to correct...

Страница 20: ...ermediate pressure 1 Refer to first stage troubleshooting 2 Orifice incorrectly adjusted 2 Reset to preliminary setting and readjust 3 Lever is damaged 3 Replace with new 1 Lever is slack or orifice i...

Страница 21: ...rifice 10 RP320 10 1 O ring 11 RP320 11 1 Mouthpiece 12 RP320 12 1 Tie Strap 13 RP320 13 1 Housing 14 RP320 14 1 Lever Pad 15 RP320 15 1 Air Barrel 16 RP320 16 1 LP Seat 17 RP320 17 1 Poppet 18 RP320...

Отзывы: