background image

XOLTA OUTDOOR BATTERY

ENERGY STORAGE SYSTEM - BAT-80

This guide provides you with the necessary information and step-by-step instructions

for the mechanical and electrical installation of a XOLTA Outdoor BESS

INSTALLATION INSTRUCTIONS

 

All-in-one Battery

Energy Storage System

BAT-80

© 2023 by XOLTA

Содержание BAT-80

Страница 1: ...80 This guide provides you with the necessary information and step by step instructions for the mechanical and electrical installation of a XOLTA Outdoor BESS INSTALLATION INSTRUCTIONS All in one Bat...

Страница 2: ...tallation requirements 11 5 Mechanical installation of the battery Mounting the battery base 12 Alternative cable routing 13 Lifting with forklift 15 Lifting with crane 15 Connnecting the battery syst...

Страница 3: ...P04 855 Vdc max Main Power Input Output 3 x 400V AC Control Power input 1 x 230V AC Weight Approx 1100 kg Impact test IEC 62262 IK08 Dimensions in mm H2170 x W845 x D800 and the battery is intended t...

Страница 4: ...the battery system at any time to ambient temperatures in excess of 50 C RISK OF ELECTRICAL SHOCK There are high voltages present on AC and DC cables There is a risk of death and serious injury due t...

Страница 5: ...emergencies the actions to take are as follows LEAKAGE The battery pack might leak toxic electrolyte Electrolyte is corrosive and odorous ACTION Avoid any contact with the leaking liquid or gas In cas...

Страница 6: ...way from the battery and contact emergency firefighters IMMERSION IN WATER Immersing the XOLTA Outdoor BESS in water risks causing a short circuit and damage to the battery system ACTION Do not try to...

Страница 7: ...res are taken to mitigate any unauthorized access to or interference with the product that can result in misuse or theft of data XOLTA and its affiliates are not liable for damages or losses related t...

Страница 8: ...rty An overvoltage has occurred in the power grid to which the product covered is connected The product covered has been exposed to force majeure including but not limited to in particular lightning f...

Страница 9: ...attery Protection Unit installed Base keys Bolts 10mm Base frontplate Materials to be provided by the installer Concrete bolts mounting the base on foundation Inverter Power cable MAX 35 mm2 Control p...

Страница 10: ...stallation requirements Minimum clearance space on all sides of the XOLTA Outdoor BESS should be observed when planning for installation see Figure x for requirements The required clearances ensure op...

Страница 11: ...dation must be level this is to insure a nice visual look and best performance from the system Height of foundation should be minimum 150mm more if area is prone to flooding The foundation must be lev...

Страница 12: ...ured to the rack base and the underlying foundation Use the 10 mm bolts to fix the battery unit onto the rack base The battery cabinets must be permanently fixed to the underlying foundation Moving th...

Страница 13: ...es on the base will automatically ensure that the rack is lifted into the right position Press the cable towards the front and down so it is accessible for the subsequent electrical installation To av...

Страница 14: ...480 mm x 4 Not futher than end of the rack Lifting with forklift If the ground is level around the installation site you can use a forklift to install the Battery Rack on the base Dismount the front...

Страница 15: ...www xolta com 15 Press cable down x 4 Press cable down Calculate based on data sheet values for eye bolts on the previous page...

Страница 16: ...VAC N 74A BAT 80 50 3 x 400VAC N 90A BAT 80 60 BPU power supply 1 x 230VAC N PE 10A per rack External power meter 3 x 400VAC N PE per meter Protective earthing Sizing according to power level above RC...

Страница 17: ...s TERMINAL TERMINAL1 TERMINAL2 TERMINAL3 TERMINAL4 Function Controller PE Controller Neutral Controller power Inverter PE Voltage specification PE AC N L 240 VAC PE Conductor cross section BAT 80 25 3...

Страница 18: ...ecting points inside the battery rack 4 8 Inverter power cables 1 3 BPU control power 9 Ethernet connection 10 Cable entry plate NOTE Please check phase order L1 L2 L3 400V 9 10 Install bolts in the b...

Страница 19: ...80 Main board fuse XOLTA BESS ELECTRICAL PANEL XOLTA Rack Terminal 5 L1 XOLTA Rack Terminal 6 L2 XOLTA Rack Terminal 7 L3 XOLTA Rack Terminal 8 N Inverter 3 Phase Circuit Breaker with fuse Controller...

Страница 20: ...he inverters of the Xolta C I are setup to follow the spe cific country region grid code e g over or under frequency response etc but for full grid code compliance they require a single and external N...

Страница 21: ...hl connection refer to device manuals Refer to the document Schaltungsempfehlungen NA Schutz und Kuppelschalter for the list of recommended motors and coupling contactors for different power levels Th...

Страница 22: ...n the frequency range of 49 5 50 5 Hz and after the mains frequency has been within this range for at least 180 s RELAY PROTECTION SETTINGS SET VALUE TIME LEVEL Overvoltage step 1 60s 253 V Overvoltag...

Страница 23: ...zert nach VDE AR N 4110 PAmax PEmax Typ 1 EZE bzw Typ 1 Speicher an gem Betriebsmittel 135 kW Oder PEmax NAP 30 kW 1 PAmax PEmax alle Typ 2 EZE bzw Typ 2 Speicher 135 kW Oder PEmax NAP 30 kW 1 PAmax a...

Страница 24: ...ection to occur only within the frequency range of 47 5 50 1 Hz and after the mains frequency has been within this range for at least 180 s For detailed information about ABB and Ziehl settings refer...

Страница 25: ...experience any problems along the way please contact our support team on 45 7060 2017 You can change the language of the app in the menu in the top right corner It is possible to switch between Danish...

Отзывы: