
QAY220 All Terrain Crane Operation Manual
11-1
Chapter 11 Transporting and loading crane
11-1 Notes on railroad
transportation
1. Research the requirements of railway
transportation in the country, which the crane
may pass through, to see if it is suitable;
2. T h e c r a n e c a n b e t r a n s p o r t e d o n
railway flat-car;
3. Block the crane wheels with wood
wedges or cement blocks;
4. Tie the crane and the flat-car with ropes
tightly;
5. All control levers and switches of the
crane must be in neutral and OFF position;
6. After loading the crane, lock all the
doors and windows to prevent opening during
transportation.
Different method of transporting crane
should be selected according to the actual
situation; the gravity center of the whole vehicle
is 2367 mm away from the slewing center, 2123
mm from the ground, 50 mm away from the
center line of frame, and overall weight is 72 t.
11-2 Notes on road transportation
1. The crane is allowed to travel on the
road;
2. The relevant transportation laws should
be observed when the crane travels on the road;
3. The control levers of superstructure
and chassis should be kept in neutral and the
power switch should be in OFF position.
Transporting and loading crane
Chapter 11
Содержание QAY220
Страница 1: ...QAY220 All Terrain Crane Operation Manual Courtesy of CraneMarket com ...
Страница 2: ...Courtesy of CraneMarket com ...
Страница 4: ...Courtesy of CraneMarket com ...
Страница 10: ...Courtesy of CraneMarket com ...
Страница 36: ...QAY220 All Terrain Crane Operation Manual 1 24 Chapter 1 Courtesy of CraneMarket com ...
Страница 43: ...QAY220 All Terrain Crane Operation Manual 2 7 Chapter 2 Courtesy of CraneMarket com ...
Страница 44: ...QAY220 All Terrain Crane Operation Manual 2 8 Chapter 2 Courtesy of CraneMarket com ...
Страница 53: ...QAY220 All Terrain Crane Operation Manual 3 9 Chapter 3 Courtesy of CraneMarket com ...
Страница 54: ...QAY220 All Terrain Crane Operation Manual 3 10 Chapter 3 Courtesy of CraneMarket com ...
Страница 68: ...QAY220 All Terrain Crane Operation Manual 4 14 Crane operation Chapter 4 Courtesy of CraneMarket com ...
Страница 78: ...QAY220 All Terrain Crane Operation Manual 4 24 Chapter 4 Courtesy of CraneMarket com ...
Страница 88: ...QAY220 All Terrain Crane Operation Manual 5 10 Fig 5 6 Accessories Chapter 5 Courtesy of CraneMarket com ...
Страница 98: ...QAY220 All Terrain Crane Operation Manual Fig 12 Fig 13 5 20 Accessories Chapter 5 Courtesy of CraneMarket com ...
Страница 107: ...QAY220 All Terrain Crane Operation Manual 5 29 Chapter 5 Courtesy of CraneMarket com ...
Страница 108: ...QAY220 All Terrain Crane Operation Manual 5 30 Chapter 5 Courtesy of CraneMarket com ...
Страница 116: ...QAY220 All Terrain Crane Operation Manual 6 8 Chapter 6 Courtesy of CraneMarket com ...
Страница 126: ...QAY220 All Terrain Crane Operation Manual 7 10 Chapter 7 Courtesy of CraneMarket com ...
Страница 134: ...QAY220 All Terrain Crane Operation Manual 8 8 Chapter 8 Courtesy of CraneMarket com ...
Страница 149: ...QAY220 All Terrain Crane Operation Manual 9 15 Chapter 9 Courtesy of CraneMarket com ...
Страница 150: ...QAY220 All Terrain Crane Operation Manual 9 16 Chapter 9 Courtesy of CraneMarket com ...
Страница 160: ...QAY220 All Terrain Crane Operation Manual 10 10 Chapter 10 Courtesy of CraneMarket com ...
Страница 164: ...QAY220 All Terrain Crane Operation Manual 11 4 Chapter 11 Courtesy of CraneMarket com ...
Страница 169: ...QAY220 All Terrain Crane Operation Manual 12 5 Chapter 12 Courtesy of CraneMarket com ...
Страница 170: ...QAY220 All Terrain Crane Operation Manual 12 6 Chapter 12 Courtesy of CraneMarket com ...
Страница 171: ...Courtesy of CraneMarket com ...
Страница 172: ...Powered by TCPDF www tcpdf org Courtesy of CraneMarket com ...