Mounting the Inverter
975-0466-01-01
2–9
AC Circuit Breaker Requirements
The main utility service panel must dedicate a single-pole (in the Active line) or
double-pole breaker for each inverter installed. This breaker must be capable of
handling the rated maximum output voltage and current of the inverter (see
“Electrical Specifications” on page A–2).
AC and DC Disconnects
Depending on the installation, external AC and/or DC disconnects may be
required, and they may need to be in a location easily accessible to utility or fire
personnel. Consult local codes and authorities for additional information.
Mounting the Inverter
Overview
General installation
steps
Installing of the GT Inverter includes these main steps:
1. Mounting the GT Inverter (this chapter)
2. Making the DC connections from the PV array to the GT Inverter
(“Connecting the DC Wiring” on page 3–2)
3. Making the AC connections from the GT Inverter to the main utility service
panel (“Connecting the AC Wiring” on page 3–7)
Figure 2-3 summarizes these steps.
WARNING: Fire, shock and energy hazards
Before installing the GT Inverter, read all instructions and cautionary markings located in
this manual, on the inverter, on the PV array, and on the main service panel.
Содержание GT2.8-AU-QC-230
Страница 1: ...Xantrex Grid Tie Solar Inverter Owner s Manual GT2 8 AU QC 230 GT5 0 AU QC 230 ...
Страница 2: ......
Страница 3: ...Xantrex Grid Tie Solar Inverter Owner s Manual ...
Страница 8: ...vi ...
Страница 14: ...Contents xii 975 0466 01 01 ...
Страница 16: ...xiv ...
Страница 18: ...xvi ...
Страница 58: ...4 4 ...
Страница 70: ...Monitoring the Inverter 5 12 975 0466 01 01 ...
Страница 76: ...Maintenance and Troubleshooting 6 6 975 0466 01 01 ...
Страница 82: ...A 6 ...
Страница 89: ......