XAG AUSTRALIA
18
Assembling:
01. Align the Alignment Marker of the Nozzle Extension Rod to the mount, then turn the quick
release knob clockwise until it is tightened.
02. Check and ensure the Nozzle Extension Rod is properly secured.
03. Insert the Nozzle signal Cable in and through the Nozzle Extension Rods.
04. Connect the Liquid Tube and secure the connected liquid tube with cable ties.
05. Remove the cable cover on the Nozzle Extension Rods, then connect the Nozzle signal cable
(6pin).
06. Affix the Cable to the cable holder, then close and secure the cable cover.
Содержание P100 2022
Страница 1: ...XAG P100 2022 Pilot s Operating Handbook LNT Mode EN Version AU V1 2...
Страница 2: ......
Страница 19: ...19 XAG AUSTRALIA Wiring Guide...
Страница 20: ...XAG AUSTRALIA 20...
Страница 34: ...XAG AUSTRALIA 34 Antenna Stand Indicator Power Button Power Port Reset Button Overview Local Network Terminal...
Страница 64: ...XAG AUSTRALIA 64 APP Operation View 13 14 15 16 17 18 19 12 11 08 09 10 07 01 02 03 04 05 06...