![wtw MIQ/CHV Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/wtw/miq-chv/miq-chv_operating-manual_1000549016.webp)
Installation
IQ S
ENSOR
N
ET
MIQ/CHV
3 - 6
Materials required
l
1 x SNCIQ or SNCIQ/UG connecting cable (see chapter 7 A
CCES
-
SORIES
AND
OPTIONS
)
l
Wire end sleeves for 0.75 mm
2
wire cross-section with matching
crimping tool
l
1 x cable gland with seal (scope of delivery of MIQ module).
Tools
l
Cable stripping knife
l
Wire stripper
l
Phillips screw driver
l
Small screw driver.
Preparing the cable
ends
1
Cut the cable to the required length.
2
Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and outer insu-
lation).
3
Only for the SNCIQ/UG earth cable:
Remove a further 35 mm of the outer insulation.
4
Shorten the exposed shielding braid up to the cable sheath.
5
Shorten the two fillers (plastic inlays) up to the cable sheath.
6
Bare the red and green wires and fit them with wire end
sleeves.
7
Fit the filler stranded wire with a wire end sleeve.
Содержание MIQ/CHV
Страница 4: ...List of contents IQ SENSOR NET MIQ CHV 0 2...
Страница 8: ...Overview IQ SENSOR NET MIQ CHV 1 4...
Страница 28: ...Installation IQ SENSOR NET MIQ CHV 3 18...
Страница 30: ...Maintenance and cleaning IQ SENSOR NET MIQ CHV 4 2...
Страница 38: ...Accessories and options IQ SENSOR NET MIQ CHV 7 2...