Installation
System 182-XT-4
3 - 2
ba75753e06
12/2014
3.2
Basics of the installation
3.2.1
System planning
Overview of planning
steps
Fig. 3-1
System planning
- Position power supply modules near
main consumers (e. g. UV/VIS sensors)
Power requirement=
S
P of all consumers
(take into account the relative
switching on time of valves)
- Number and types of required sensors
- Measuring locations to be designed
- Distances
- Infrastructure, process environment etc.
Rough planning
Determination of power requirement
Rating
Fine adjustment
IQ
to layout
S
ENSOR
N
ET
Power requirement of components
Determination of rating
of power supply modules
Fundamentals of planning
Start
End
Arrangement of
power supply modules
- Sum of all line lengths max. 250 m
Содержание DIQ/S 182-XT-4
Страница 6: ...Contents System 182 XT 4 0 4 ba75753e06 12 2014 ...
Страница 14: ...Safety System 182 XT 4 2 4 ba75753e06 12 2014 ...
Страница 68: ...Installation System 182 XT 4 3 54 ba75753e06 12 2014 ...
Страница 86: ...Operation System 182 XT 4 4 18 ba75753e06 12 2014 ...
Страница 92: ...The SETTINGS menu System 182 XT 4 5 6 ba75753e06 12 2014 ...
Страница 128: ...Maintenance and cleaning System 182 XT 4 7 2 ba75753e06 12 2014 ...
Страница 144: ...Technical data System 182 XT 4 9 12 ba75753e06 12 2014 ...
Страница 146: ...Accessories and options System 182 XT 4 10 2 ba75753e06 12 2014 ...
Страница 150: ...Appendix store separately if required System 182 XT 4 12 2 ba75753e06 12 2014 ...
Страница 151: ......