Original Operating Instructions
BATx0280-ES-1-400-1 (Outdoor)
Installation
O_BATx0280-ES-1-400-1_(Outdoor)_V1.3_GB
Page
27
of
69
Requirements for the installation site:
•
Foundation and formwork must be built according to applicable local regulations
and standards.
•
Ensure that there is sufficient room for installation, mounting, operation and
repair.
•
Required ambient conditions must be fulfilled (Table 11).
•
Ensure that the minimum required distances for escape routes must be followed
according to applicable local regulations and standards.
•
The product must be positioned on a foundation that ensures sufficient air
circulation. The moved cooling air volume can be seen in Table 11.
•
The product must be properly positioned on the foundation.
Figure 10 shows the area of the cable entries. All dimensions are given in millimetres.
Figure 10: Cable entry area (bottom view)
Pos.
Description
1
Communication, measuring, supply voltage
2
AC connection
3
DC connection
Содержание BAT 0280-ES-1-400-1 Series
Страница 69: ......