woundwo WINGLINE Скачать руководство пользователя страница 11

WINGLINE

MOUNTING INSTRUCTIONS

 

11

10

July 2014    Misprint and technical changes reserved.     © by WO&WO    Art.-Nr.: 930113_DE

WWW.

WoundWo

.COM

3.4     Completing the installation / transfer to the Client

• 

Clear site. Remove packaging materials from site and dispose according to local regulations.

• 

Hand over to client all instructions concerning the installation and operation of the awning as well  

 

as the instructions for the electrical connections of control units and switches.

Give client comprehensive instructions about the operation of the awning. Failure to observe the  

instructions and incorrect operation can result in damages to the awning and accidents.

Notify client of the wind resistance class of the awning.

4.  

  dismounting the aWning

Ensure that the area around the awning is free of unauthorised personnel. De-energise awnings with driving gear 

and secure against accidental switch-on.

• 

Dismount the awning exclusively in retracted condition.

• 

Dismounting of the awning is the reverse of the mounting procedure

Type of defecT

cause

Remedy

Driving gear does not work

No power

Check connection (specialised company)

Driving gear not correctly connected

Check connection (specialised company)

Thermal protection of the driving 

gear activated

Wait for 15-20 mins, then operate again

Remote control batteries empty

Check light signal on sending unit, 

replace batteries

Higher-level control unit prevents 

manual operation

Wait until higher-level signal is not activated 

any more.

System does not extend or 

retract fully

End positions of the driving gear chan-

ged, or incorrect end position setting

Reset or re-program end positions (see 

instructions about driving gear adjustment)

Awning makes grating noises

Insufficient lubrication

Spray arm articulation bearing with a 

suitable lubricant (e.g. Teflon spray)

Arms do not fold parallel or are 

under load

Drop bar holder positioned incorrectly Move drop bar holder along drop profile as 

necessary

5.  

troubleshooting

3.3.     mounting the roof

• 

The awning is in the back end position.

• 

Place the premounted roof from above onto the 

 

links of the side parts. 

• 

Screw the roof to the side parts.

 

In the version with 2 posts, use 4 screws each on  

 

the fronts of the side parts.

 

In the version with 1 post and wall connection on the  

 

free side, use 4 countersunk screws at the front of the  

 

side part. On the wall side, insert 4 rounded head  

 

screws from the top through the predrilled fixing  

 

positions of the roof profiles.

Содержание WINGLINE

Страница 1: ...MOUNTING INSTRUCTIONS Wingline MOUNTING INSTRUCTIONS Wingline 930113 _FR...

Страница 2: ...persons or for the function of the awning This symbol highlights important product information for the installation engineer Safety notes and important information are integrated in the text as approp...

Страница 3: ...f the awning seem doubtful please consult the ma nufacturer of the system and a mounting installation specialist If the information above is not observed the awning system may fall down and put the he...

Страница 4: ...in such a way that its axis lies at the system joint as shown on the above diagram Determine the position for the posts using the table Mounting with 2 posts System width System width System width A...

Страница 5: ...0 750mm 4800 150 650mm 150 200mm 150mm 4950 150 450mm 300 750mm 5000 150 450mm 150 200mm 5200 350 750mm 5300 150mm 5000 150 650mm 5400 150 200mm 5600 150 650mm 450 450mm 6000 150 650mm 150 650mm 150 4...

Страница 6: ...outsides Connect posts and foot with hex head screws washers and nuts through the predrilled holes If applicable pull the power supply cable for the driving gear through the tube of the post before in...

Страница 7: ...premounted arms and side parts into the posts and align laterally Fix cross tube with clamping screws 3 off per post in the posts Push the black counter bearing onto the end cap of the cloth roller Pu...

Страница 8: ...flange or with the cloth roller end cap into the counter bearing On the opposite side push the side part onto the cross tube Push the motor into the motor flange respectively the cloth roller end cap...

Страница 9: ...d out exclusively by a licensed electrical company 3 1 Adjusting the inclination headroom The awning is prebuilt in the factory with approximately 0 inclination If a steeper adjustment of the awning i...

Страница 10: ...the inner side mount the drop bar holder washers and nuts Tighten firmly for definite fixing of the drop bar holder in the drop profile Wind in awning to the back end position Also check that arms fol...

Страница 11: ...rrectly connected Check connection specialised company Thermal protection of the driving gear activated Wait for 15 20 mins then operate again Remote control batteries empty Check light signal on send...

Страница 12: ...ace of publication 8054 Graz Austria www woundwo com Austria Tel 43 0 316 2807 0 Fax 43 0 316 2807 8100 Germany Tel 49 0 5684 9232 0 WO WO Sonnenlichtdesign GmbH Co KG Hafnerstra e 193 8054 Graz AUSTR...

Отзывы: