woundwo WINGLINE Скачать руководство пользователя страница 10

WINGLINE

MOUNTING INSTRUCTIONS

 

11

10

July 2014    Misprint and technical changes reserved.     © by WO&WO    Art.-Nr.: 930113_DE

WWW.

WoundWo

.COM

3.2.    adjusting end positions/finishing the mounting of the drop bar holder

The end positions of the awning are preset in the factory. 

If the inclination is changed, a correction may be necessary.

• 

Fully extend awning and check switch-off point.

On the inner side, mount the drop bar holder washers and 

nuts. Tighten firmly for definite fixing of the drop bar holder 

in the drop profile!

• 

Wind in awning to the back end position.  

 

Also check that arms fold in parallel.

• 

Correct the back end position according to the motor  

 

adjustment instructions.

 

The arms should touch the cross tube slightly at the 

 

buffers and the drop profile should be in the position  

 

indicated on the right.

Post 2600 mm

Post 3000 mm

Post 3400 mm

System height in mm

projection

Содержание WINGLINE

Страница 1: ...MOUNTING INSTRUCTIONS Wingline MOUNTING INSTRUCTIONS Wingline 930113 _FR...

Страница 2: ...persons or for the function of the awning This symbol highlights important product information for the installation engineer Safety notes and important information are integrated in the text as approp...

Страница 3: ...f the awning seem doubtful please consult the ma nufacturer of the system and a mounting installation specialist If the information above is not observed the awning system may fall down and put the he...

Страница 4: ...in such a way that its axis lies at the system joint as shown on the above diagram Determine the position for the posts using the table Mounting with 2 posts System width System width System width A...

Страница 5: ...0 750mm 4800 150 650mm 150 200mm 150mm 4950 150 450mm 300 750mm 5000 150 450mm 150 200mm 5200 350 750mm 5300 150mm 5000 150 650mm 5400 150 200mm 5600 150 650mm 450 450mm 6000 150 650mm 150 650mm 150 4...

Страница 6: ...outsides Connect posts and foot with hex head screws washers and nuts through the predrilled holes If applicable pull the power supply cable for the driving gear through the tube of the post before in...

Страница 7: ...premounted arms and side parts into the posts and align laterally Fix cross tube with clamping screws 3 off per post in the posts Push the black counter bearing onto the end cap of the cloth roller Pu...

Страница 8: ...flange or with the cloth roller end cap into the counter bearing On the opposite side push the side part onto the cross tube Push the motor into the motor flange respectively the cloth roller end cap...

Страница 9: ...d out exclusively by a licensed electrical company 3 1 Adjusting the inclination headroom The awning is prebuilt in the factory with approximately 0 inclination If a steeper adjustment of the awning i...

Страница 10: ...the inner side mount the drop bar holder washers and nuts Tighten firmly for definite fixing of the drop bar holder in the drop profile Wind in awning to the back end position Also check that arms fol...

Страница 11: ...rrectly connected Check connection specialised company Thermal protection of the driving gear activated Wait for 15 20 mins then operate again Remote control batteries empty Check light signal on send...

Страница 12: ...ace of publication 8054 Graz Austria www woundwo com Austria Tel 43 0 316 2807 0 Fax 43 0 316 2807 8100 Germany Tel 49 0 5684 9232 0 WO WO Sonnenlichtdesign GmbH Co KG Hafnerstra e 193 8054 Graz AUSTR...

Отзывы: