With the oven supported by a forklift or pallet jack,
slide and secure the caster assemblies into the end
forklift pockets�
NOTE: the casters will add 3" to
the total height of the oven. The vent shield on
top can be removed temporarily if necessary.
Once the oven is in place, support the unit using a
pallet jack and remove the caster and its support� be
sure to seal the side and front forklift pockets using
the covers provided�
Once the front and side forklift pockets are no longer
needed, they must be closed using the metal covers
provided�
be sure to replace all screws and bolts after removal
of the shipping steel and covering of the forklift
pockets�
this oven is designed to be sealed to the floor upon
installation� use a silicone sealant acceptable to the
local health official�
USE OF OPTIONAL TEMPORARY CASTERS
Vent shield
Shown:
Left-hand configuration
8
An ongoing program of product improvement may require us to change
specifications without notice.
FD-6045, Revised October 2013
or visit
woodstone-corp.com
wood stone corporation
1801 w. bakerview rd.
bellingham, wa 98226 usa
tf. 800.988.8103
t. 360.650.1111
f. 360.650.1166
UNLOADING AND MOvING
FD-6045 Fire Deck Oven
installation and Operation manual
Forklift pocket cover