Installation & Setup
Electrical Installation
Installation & Setup
TD02doc072519
3-12
3
3.4
Electrical Installation
This section explains how to connect the Transfer Deck and the Incline Conveyor to work
together.
DANGER!
Make sure all electrical installation, service
and/or maintenance work is performed by a qualified elec-
trician and is in accordance with applicable electrical codes.
To connect the transfer deck to the incline conveyor:
1.
Route the air lift and kicker valve cables along the transfer frame. Use the provided
clamps to secure the cable in place. Connect the cables to the air lift and kicker valves
located under the transfer deck air bag.
See Figure 3-12.
FIG. 3-12 TRANSFER DECK (TD1)
Power Cord
To Incline Conveyor
(3-wire Cord)
To Control
Box
Control Box
Lift Valve
Connect the cable
to the lift valve
To Lift Valve
TD0032B
To Incline
Conveyor
(2-wire
Cord)