
Installation & Setup
Air Installation
3
3-9
TD02doc072519
Installation & Setup
Wood-Mizer Incline Conveyor. After connecting the transfer deck table to the air supply,
the transfer deck table automatically lowers when the board or cant gets between the
electronic sensors on the incline conveyor belt. The transfer deck table automatically
raises when the board or cant leaves the incline conveyor and there is no object on the
incline conveyor belt between the electronic sensors.
To operate the transfer deck with the incline conveyor, connect the air supply to the trans-
fer deck air supply line.
NOTE:
Make sure each hose fits tight on the fitting before operat-
ing the unit.